FABRICATION SHOP

Projects

Rake Fingers

Fabricated Rake Fingers
Fabrication Type AWS D1.1, API, Gas Metal Arc Welding (GMAW)/MIG), Flux Core Arc Welding (FCAW), Cut, Fit-up, Assembly
Materials Used A36 Carbon Steel
Testing/Inspections Performed PT - Penetrant Testing, VT - Visual Inspection, Dimensional Inspection
Turnaround Time 2 Weeks
Industry For Use Energy
Type of Use Drilling Rig
Location of Use USA