Mud Pump

Pump designed to circulate drilling fluid under high pressure.

Fabrication Type
ASME, AWS D1.1 Gas Metal Arc Welding (GMAW/MIG), Flux Core Arc Welding (FCAW), Cut, Fit-up, Roll, Assembly, Paint, Blast
Project Dimensions
45.5' x 10' x 10'
Materials Used
A36 Carbon Steel
Testing/Inspections Performed
PT - Penetrant Testing, RT - Radiography, VT - Visual Inspection, Dimensional Inspection, Hydro Testing
Turnaround Time
4-6 Weeks
Industry For Use
Energy
Type of Use
Down hole drilling
Location of Use
USA
Gas Lifting Skid

Specifically designed Gas Lifting Skid for well production

Fabrication Type
ASME Vessel, AWS, Gas Tungsten Arc Welding (GMAW/MIG), Flux Cored Ar Welding (FCAW), Submerged Arc Welding (SAW), Cut, Fit-up, Roll, Assembly, Blast, Paint
Project Dimensions
33' 6" x 9' 5" x 13' 8.5"
Materials Used
SA-516-70, A-36, A-105, SA-106-B Steel
Testing/Inspections Performed
MT - Magnetic Particle, PT - Penetrant Testing, RT - Radiography, VT - Visual Inspection, Dimensional Inspection, Hydro Testing, Pneumatic Testing, Function Testing
Turnaround Time
8-12 Weeks
Industry For Use
Energy
Type of Use
Natural Gas
Location of Use
USA
Gas Compressor System

Gas compression skid meeting all AWS and ASME standards for use in the oil and gas market

Fabrication Type
ASME Vessel, AWS, Gas Tungsten Arc Welding (GMAW/MIG), Flux Cored Ar Welding (FCAW), Submerged Arc Welding (SAW), Cut, fit-up, Roll, Assembly, Blast, Paint
Project Dimensions
180" x 120" x 72"
Materials Used
A-36 Steel, SA-516 70, SA-105
Testing/Inspections Performed
MT - Magnetic Particle, PT - Penetrant Testing, RT - Radiography, VT - Visual Inspection, Dimensional Inspection, Hydro Testing, Pneumatic Testing, Function Testing
Turnaround Time
8-12 Weeks
Industry For Use
Energy
Type of Use
Natural Gas
Location of Use
USA
ZEVAC

ZEVAC® = Zero Emission Vacuum and Compressor. The ZEVAC® provides zero venting, zero flaring, zero emissions and is the environmentally responsible way to handle natural gas in the pipeline. These units use compressed air to suction natural gas from a pipeline segment and compress it into the adjacent connection – keeping the gas inside the pressurized system the entire time.

ZEVAC® is the property of TPE Midstream LLC. Visit tpemidstream.com for more information.

 

Fabrication Type
ASME, Gas Metal Arc Welding (GMAW/MIG), Gas Tungsten Arc Welding (FTAW/TIG), Flux Core Arc Welding (FCAW), Cut, Fit-up, Assembly, Blast, Paint
Project Dimensions
Single - 57.25" x 28.25" x 42.25" Double - 57.25" x 38" x 42.25"
Materials Used
A36 Carbon Steel frame, interior unit aluminum and stainless steel tubing and fittings
Testing/Inspections Performed
PT - Penetrant Testing, Dimensional Inspection, Hydro Testing, Pneumatic Testing, Function Testing
Turnaround Time
4-6 Weeks
Industry For Use
Energy
Type of Use
Pipeline Maintenance
Location of Use
USA
Waste Water Filter

Custom fabricated unit for the filtration and treatment of waste water.

Fabrication Type
AWS D1.1, Gas Metal Arc welding (GMAW/MIG), Flux Core Arc Welding (FCAW), Cut, Fit-up, Assembly, Blast, Paint
Project Dimensions
12' x 11' 6" x 46' 11.5"
Materials Used
A36 Carbon Steel, Stainless Steel
Testing/Inspections Performed
PT - Penetrant Testing, VT - Visual Inspection, Dimensional Inspection
Turnaround Time
4-6 Weeks
Industry For Use
Water/Waste
Type of Use
Waste Management
Location of Use
USA
ASME Tower

H2SZero – ASME Tower used for H2S sour gas abatement.

Fabrication Type
ASME, AWS D1.1, Gas Metal Arc Welding (GMAW/MIG), Flux Core Arc Welding (FCAW), Submerged Arc Welding (SAW), Weld Overlay (WOL), Cut, Fit-Up, Roll, Assembly, Blast, Paint
Project Dimensions
72" OD, 34' t x 10'8" w, 20,000 lbs.
Materials Used
SA516 Grade 70, A36 Carbon Steel
Testing/Inspections Performed
RT - Radiography, VT - Visual Inspection, Hydro Testing
Turnaround Time
8-12 Weeks
Industry For Use
Energy
Type of Use
Oil and Gas Pipeline
Location of Use
Refinery
Pistol Grill

Large scale grill custom built in the shape of a pistol.

Fabrication Type
Gas Metal Arc Welding (GMAW/MIG), Flux Core Arc Welding (FCAW), Cut, Fit-up, Roll, Assembly, Blast, Paint
Project Dimensions
9' x 18'
Materials Used
SA36, 11 ga. 1/8" steel, angle iron
Testing/Inspections Performed
VT - Visual Inspection, Dimensional Inspection, and 400 hamburgers and 250 hot dogs grilled to perfection
Turnaround Time
3 Weeks
Industry For Use
Tailgating
Type of Use
Grilling
Location of Use
Oklahoma
Crude Gas Liquid Separation Vessel

This ASME separation vessel provides a buffer vacuum to accommodate high flow in the form of a slug.

Fabrication Type
ASME, Shielded Metal Arc Welding (SMAW/Stick Electrode), Gas Metal Arc Welding (GMAW/MIG), Flux Core Arc Welding (FCAW), Submerged Arc Welding (SAW), Cut, Fit-up, Roll, Assembly, Blast, Paint
Project Dimensions
11' x 55'
Materials Used
3.25" wall, 5' and 10', Grade 516-70 shells
Testing/Inspections Performed
PT - Penetrant Testing, RT - Radiology, VT - Visual Testing, Dimensional Inspection, Hydrostatic Testing, Pneumatic Testing
Turnaround Time
10 weeks
Industry For Use
Energy
Type of Use
Oil and Gas Pipeline
Location of Use
Refinery in Louisiana
Elevated Skid

Platform and launcher skid for automated spherical pigging system

Fabrication Type
ASME Flux Core, Flux Core Arc Welding (FCAW), Assembly, Galvanizing
Project Dimensions
16' x 45'
Materials Used
Carbon Steel: A36
Testing/Inspections Performed
MT - Magnetic Particle, VT - Visual Inspection, Dimensional Inspection
Turnaround Time
3-6 Weeks
Industry For Use
Energy
Type of Use
Pipeline Control Equipment
Location of Use
USA
Piping

Fuel Gas Skid welded using TIG, MIG and Flux Core in 1, 2, and 5G pipe positions.

Fabrication Type
Gas Metal Arc Welding (GMAW/MIG), Gas Tungsten Arc Welding (GTAW/TIG), Flux Core Arc Welding (FCAW), Cut, Fit-up, 3-Part Paint Stystem
Project Dimensions
from 6" - 40"
Materials Used
Carbon: A5L, A53B, ALSXN
Testing/Inspections Performed
RT - Radiography, VT - Visual Inspection, Hydro Testing, Paint VT, Mill Thickness
Turnaround Time
3-8 Weeks
Industry For Use
Energy
Type of Use
Natural Gas
Location of Use
USA
5′ Sub Platform (Pony Sub)

5′ sub platform to change the elevation of drilling work area.

Fabrication Type
ASME, Gas Metal Arc Welding (GMAW/MIG), Flux Core Arc Welding (FCAW), Cut, Fit-up
Project Dimensions
5' x 11' x 40'
Materials Used
A36, 516-70 carbon steel
Testing/Inspections Performed
MT - Magnetic Particle, PT - Penetrant Testing, VT- Visual Inspection, Dimensional Inspection
Turnaround Time
4-6 weeks
Industry For Use
Energy
Type of Use
Drilling
Location of Use
USA
Custom Trailer

Custom trailer built to transport spherical test pigs for the pipeline.

Fabrication Type
Gas Metal Arc Welding (GMAW/MIG), Flux Core Arc Welding (FCAW), Cut, Fit-up
Project Dimensions
8' x 26' x 15'
Materials Used
Carbon and Aluminum
Testing/Inspections Performed
VT - Visual Inspection, Function Testing
Turnaround Time
2-4 Weeks
Industry For Use
Energy
Type of Use
Pipeline Equipment
Location of Use
USA
Mixing Tank

Large-capacity 5,000 gallon citric acid mixing tank.

Fabrication Type
Gas Tungsten Arc Welding (GTAW/TIG), Flux Core Arc Welding (FCAW), Cut, Roll, Fit-up
Project Dimensions
11' x 9'
Materials Used
316 Stainless Steel
Testing/Inspections Performed
VT - Visual Inspection, Dimensional Inspection, Static Load Testing - Water
Turnaround Time
6-8 Weeks
Industry For Use
Food
Type of Use
Chemical Manufacturing Facility
Location of Use
USA
Raw Gas CRG Burner

Industrial utility burner designed to meet NOx reduction requirements.

Fabrication Type
ASME, Gas Metal Arc Welding (GMAW/MIG), Gas Tungsten Arc Welding (GTAW/TIG), Flux Core Arc Welding (FCAW), Cut, Fit-up
Project Dimensions
108" x 54" x 54"
Materials Used
Carbon: 105N, A106B, 316 Stainless Steel, INCONEL
Testing/Inspections Performed
PT - Penetrant Testing, VT - Visual Inspection, Dimensional Inspection, Hydro Testing
Turnaround Time
4-6 Weeks
Industry For Use
Energy
Type of Use
Natural Gas
Location of Use
USA
ASME Vessel

Air supply vessel for an internal pipe line-up clamp, built to ASME code with a certified U stamp.

Fabrication Type
ASME Welding, Flux Core Arc Welding (FCAW), Submerged Arc Welding (SAW), Cut, Fit-up, Roll, Blast, Paint
Project Dimensions
23" x 26"
Materials Used
Carbon Steel: A106B, A36, A105N
Testing/Inspections Performed
RT - Radiography, VT - Visual Inspection, Hydro Testing
Turnaround Time
2-4 Weeks
Industry For Use
Energy
Type of Use
Pipeline Construction
Location of Use
USA