Skip to content
About Us
Capabilities
Quality Control
Projects
Videos
Blog
Contact Us
Pipe Supports
Pipeline Equipment
FABRICATION SHOP
Projects
Packaged Pump Skid
Pre-fabricated packaged pump skids – complete and ready to install
Fabrication Type
AWS D1.1, Gas Metal Arc Welding (GMAW)/MIG), Gas Tungsten Arc Welding (GTAW/TIG), Flux Core Arc Welding (FCAW), Submerged Arc Welding (SAW), Cut, Fit-up, Roll, Assembly, Blast, Paint
Testing/Inspections Performed
MT - Magnetic Particle, PT - Penetrant Testing, VT - Visual Inspection, Rt - Radiography, Dimensional Inspection, Hydro Testing
Turnaround Time
12 Weeks
Industry For Use
Energy