FABRICATION SHOP

Projects

Industrial Pump Skid

A skid-mounted pump package

Assembling an industrial pump skid at Sawyer Fabrication Industrial Pump Skid - fabrication project Industrial pump skid in production at Sawyer Fabrication

ASME skid
Fabrication Type AWS D1.1, Gas Metal Arc Welding (GMAW)/MIG), Flux Core Arc Welding (FCAW), Submerged Arc Welding (SAW), Cut, Fit-up, Roll, Assembly, Blast, Paint
Testing/Inspections Performed MT - Magnetic Particle, PT - Penetrant Testing, RT - Radiography, VT - Visual Inspection, Dimensional Inspection, Hydro Testing
Turnaround Time 12 Weeks
Industry For Use Energy