FABRICATION SHOP

Projects

Hydro Bunker for Frack Pumps

Hydrostatic High-Pressure Test Bunker – 3.5″ Plate – 93,000 lbs.

Large machining project for frack bunker finished machined frack bunker pieces Fabrication of Fracking Bunker

Fracking Bunker
Fabrication Type Machining, Gas Metal Arc Welding (GMAW)/MIG), Cut, Fit-up, Assembly
Project Dimensions 7.8' H x 8.6' W
Materials Used Carbon Steel: A36,
Testing/Inspections Performed VT - Visual Inspection, Hydro Testing
Turnaround Time 2-4 Weeks
Industry For Use Energy
Type of Use Fracking Pumps
Location of Use USA