Skip to content
About Us
Capabilities
Quality Control
Projects
Videos
Blog
Contact Us
Pipe Supports
Pipeline Equipment
FABRICATION SHOP
Projects
Gas Lift Skid
Lift and Load Skids for Natural Gas. Controls the flow of natural gas off of a well.
Fabrication Type
ASME Vessel, Gas Metal Arc Welding (GMAW)/MIG), Flux Core Arc Welding (FCAW), Submerged Arc Welding (SAW), Cut, Fit-up, Roll, Assembly, Blast, Paint
Project Dimensions
33' x 7'11" x 9' 8-3/8"
Materials Used
A-36 Steel, A1011 Steel, Sch. 40 Pipe, Sch. 160 Pipe
Testing/Inspections Performed
MT - Magnetic Particle, PT - Penetrant Testing, RT - Radiography, VT - Visual Inspection, Dimensional Inspection, Hydro Testing, Pneumatic Testing, Function Testing
Turnaround Time
8-12 Weeks
Industry For Use
Energy
Type of Use
Natural Gas
Location of Use
USA